House renovation, five bedrooms and five bathrooms
Stud walls, first-fix electrics and plumbing through the house, finished with five bathrooms and five bedrooms.



From the footings to the finished bathroom, one builder for the whole house. Every stage of a recent job is in the build diary below.
One builder for the whole house, from the footings to the finished bathroom.
Based in Woking, working across Surrey and Hampshirejrbuildingmaintenance@outlook.com
Stairs and landingfinished by JR Building
A two-storey extension on the back, a single-storey on the side, and the whole house turned into a 6-bed HMO. These are the photos and words we put on Facebook as the job went.
Our Facebook pageWeek 1
“New job started: a two-storey extension on the back and a single-storey on the side, turning the house into a 6-bed, 5-bath HMO.”
Week 3
“It doesn't look like much yet, but a whole lot of work has gone into this so far.”
Week 6
“Week six done: most of the graft and dust out of the way. Now we start putting this house back together. Plasterboarding starts next week.”
Week 8
“Roof completed, plastering well on its way. A few bits of boarding downstairs, then we crack on with the bathrooms.”
Week 12
“Almost there. Another week or so and we'll be complete.”
Week 17
“All done. On to the next.”



Frames from our own videos of each job.
Before
After
Before
AfterStud walls, first-fix electrics and plumbing through the house, finished with five bathrooms and five bedrooms.



A loft conversion and full house restoration, turning the house into a 6-bed, 5-bathroom HMO.



JR Building & Maintenance is a building firm based in Woking, working across Surrey and Hampshire. We take a house from the footings to the finished bathroom, so you deal with one firm from the first visit to the handover.
07999 733413Single and two-storey, on the back or the side of the house.
See the footings in week 3Houses stripped back to the brickwork and put together again.
See the stud walls in week 6Bedrooms, shower rooms and a shared kitchen, laid out for tenants.
Read the build diaryNew roofs on extensions and houses, with roof windows where you want the light.
See a roof go on in week 6Walls and ceilings boarded and skimmed for decorating.
See the plastering in week 8Kitchens fitted, from the units and worktops to the hob and extractor.
See the kitchen fitted in week 12Wall panels, shower enclosures, vanity units, towel rails and floors.
See the finished shower roomsFloors laid through the house, stairs finished and carpeted.
See the stairs in week 17Repairs and smaller jobs around the house.
Ask about a smaller jobSend us a few photos of the house, the postcode and what you have in mind. If you already have drawings or planning permission, tell us.
07999 733413We come to the house, look at what you want done and price it.
Groundwork, walls and roof first, then the house is boarded and plastered.
Kitchens, bathrooms, floors, stairs and doors.
We walk round the finished house with you before we hand it back.